AG replied on Thursday, April 21, 2011 01:12 PM
Dear All. BT(Pvt)Ltd. Design Wing Rawalpindi. Charges for 01 Kanal Plot. 1.Architectural Drawings = 115,000/- 2.Soil Test (2 Bores) = 015,000/- 3.Normal Structure(Elect+Plumb) = 020,000/- 4.Total (1+2+3 above) = 150,000/- 5.Frame Structure (Extra Payment) = 010,000/- 6.Design Approval = 095,000/- Total Charges for Non Structural Design = 115,000+020,000+095,000 = 230,000/- Total Charges for Structural Design = 230,000+015,000+010,000 = 255,000/- Regards. |