Land acquisition for SL of Ring Road in progress
Monday, May 16, 2011
LAHORE
An amount of Rs 21.6 billion will be spent on the acquisition of southern section of Ring Road in accordance with the revised design.
According to official sources, the Punjab government is acquiring land for 8.5 kilometres southern loop (SL-1) from Sui Gas Town to Ferozpur Road at a cost of Rs 4,995million. For 13 kilometres southern loop-2 from Ferozepur Road to Raiwind Road, the Punjab government will spend Rs 4091.70 for land acquisition while its work will be executed by a Chinese company on build, operate and transfer (BOT) basis. Similarly, the Punjab government will acquire land for 8 kilometres southern loop-3 at a cost of Rs 4,059.96 million from Raiwind Road and Multan Road and for the purpose PC-I is in process for the approval of land acquisition. A sum of Rs 4449.12 million will be spent on land acquisition for 18 kilometre southern loop-4 from Multan road to Motorway M-2 while an approximate amount of Rs 4 billion would be spent on the acquisition of land from Babu Sabu to pacakge No. 5, having a length 2.5 kilometres.
The Punjab government will execute work on SL-1 including acquisition of land while the execution of SL-2,3 and 4 would be carried out by a Chinese company on BOT basis. According to the revised design, Ring Road will pass through Sui Gas Town, Gajumata, Halloki, Adda Plot, Maraka,Mohlanwal, Chung, Shahpur, Motorway Babu Sabu Interchange and Gulshan-e-Ravi at Package No.5.
CMY replied on Tuesday, May 17, 2011 10:35 AM PST
Pak China friendship Zinda abad. They are now funding Lahore Ring road and Lahore Mass transit system. China is our true friend and we should focus only on China the only TRUE economic world power.
Ch Mujahid Yasin ( CMY )
123 replied on Tuesday, May 17, 2011 11:16 AM PST
can any one update latest map of ring road. CMY replied on Tuesday, May 17, 2011 07:46 AM
I visited interchange of ring road near Sui Gas 1 and State Life phase 1. I was surprised to see its not a full / proper interchange and only a bridge on top of ring road so traffic from Sui Gas 1 could go to State Life 1 etc. No entry or exit from ring road for Sui Gas or State life etc? This bridge is just accommodating the road traffic that was running along ganda Nalla in front of Sui Gas HS. It means only one proper interchange for entry or exit from DHA Lahore on Lahore ring road will be at DHA5 and DHA6 interchange. Any one have better info please do share it here for our knowledge. Ch Mujahid Yasin ( CMY ) |
Lahori replied on Tuesday, May 17, 2011 10:32 AM
Thank you CMY for your detailed answer. other members are encouraged to share their information about this topic. thanks |
Osman replied on Wednesday, May 18, 2011 08:34 AM
as per my information, the bridge is actually an interchange but different than the Abdullah Gul or DHA-5 interchanges that have a round down approaches (mimicking a flower). The bridge lands in State Life and then there is a round about (park) through which traffic will enter the ring road. The ring road sidelanes also enter into Sui gas town and run parallel to the bridge. The bridge will certainly connect with DHA -5 (LGS road) and for that matter a couple of houses and a Kabaria will be demolished. As per LRR PMU sources there is a dispute as to how Sui Gas -1 will be accommodated in the process as Sui Gas Society is demanding access from DHA Phase-V as well as from main ring road. If that happens, it would place Sui Gas society at a very formidable/accessible position by which Sui Gas residents will have direct and speedy access to both DHA and Ring Road/ Ferozpur road. |
kamal replied on Wednesday, May 18, 2011 06:03 PM
@ Osman..you have provided very useful information...a person coming from ferozpur road side on ring road..how he will enter statlife-1..if there there is no round up or round down approach?? |
Osman replied on Thursday, May 19, 2011 03:48 AM
Actually, Punjab Government (LRR project) is in process of acquiring land to construct 8 km dual carriage way connecting main ring road (northern loop ) with Ferozpur road at Gaju Matta. This will further connect to Kalma chowk flyover (now under construction). This has been done because of lack of funds to start the southern loop. However, it will greatly benefit DHA-5/6 , Sui Gas and State Life-1 residents that otherwise were very distant from Ferozpur road. As far as connectivity of adjacent societies like Sui Gas-1 and State Life-1 is concerned, these shall be given access through sidelanes. Now coming to your precise question, while coming from Ferozpur , I think you will take the sidelane and head for the park straigth away , take a round turn (without climbing up the bridge) and enter into State Life (Hopefully State Life will erect a gate over there) Actually since my house is under construction in Sui Gas-1 I was more curious about the entry/exit points. The engineer showed be a highly technical drawing from which I picked up the planned routes. I learned that Sui Gas has been assured of entry/exit point to the ring road. I am keeping my fingers crossed as construction on ring road and its sidelanes is in full swing. DHA is very interested in getting its Phase-V connected to the bridge to provide DHA-4 residents access to ring road but there is a simmering dispute between the powerful directors of DHA and Sui Gas Society, the same friction that thwarted DHA's attempt to take over Sui Gas in 2009. I will check on more details from LRR sources and keep posted |
Osman replied on Thursday, May 19, 2011 03:51 AM
Actually, Punjab Government (LRR project) is in process of acquiring land to construct 8 km dual carriage way connecting main ring road (northern loop ) with Ferozpur road at Gaju Matta. This will further connect to Kalma chowk flyover (now under construction). This has been done because of lack of funds to start the southern loop. However, it will greatly benefit DHA-5/6 , Sui Gas and State Life-1 residents that otherwise were very distant from Ferozpur road. As far as connectivity of adjacent societies like Sui Gas-1 and State Life-1 is concerned, these shall be given access through sidelanes. Now coming to your precise question, while coming from Ferozpur , I think you will take the sidelane and head for the park straigth away , take a round turn (without climbing up the bridge) and enter into State Life (Hopefully State Life will erect a gate over there) Actually since my house is under construction in Sui Gas-1 I was more curious about the entry/exit points. The engineer showed be a highly technical drawing from which I picked up the planned routes. I learned that Sui Gas has been assured of entry/exit point to the ring road. I am keeping my fingers crossed as construction on ring road and its sidelanes is in full swing. DHA is very interested in getting its Phase-V connected to the bridge to provide DHA-4 residents access to ring road but there is a simmering dispute between the powerful directors of DHA and Sui Gas Society, the same friction that thwarted DHA's attempt to take over Sui Gas in 2009. I will check on more details from LRR sources and keep posted |
Kamal replied on Thursday, May 19, 2011 05:16 AM
Thanks Osman, but confusion is still there...if you are coming from ferozpur side then you are on left hand side of ring road and statelife would be at your right side and there is center median/barrier on ring road ..how you go to right side..as i know on ring road like projects there is no round about or U-turn on it. |
Osman replied on Thursday, May 19, 2011 09:33 AM
I vividly remember the technical drawing (map showed clusters of coordinates etc). What I gathered was like........ 1. Traffic coming from Ferozpur (left side) runs under the overhead bridge, turns left into Sui Gas through a road ( being constructed parallel to the landing of the bridge) 2. The traffic will encounter a roundabout (where Sui Gas Society's present gate is installed which will be pushed back) 3. Through the roundabout, the traffic will climb the over head bridge and land deep into State Life If you visit Sui Gas society, you will see one kanal sui gas houses sandwiched between the under construction bridge and two under construction roads. Now one of those roads (not the bridge) is the one entering from ring road (for traffic coming from Ferozpur rd) and the other one will take traffic from Suigas and DHA to the ring road towards DHA-5/6 interchange. This very road rejoins ring road right in front of my plot (F-95) Hope it clarifies some of your confusion! Now the million dollar question is that if DHA gets connected with this vital bridge (remember, DHA Phase-9/10 are planned behind StateLife society so this bridge could connected DHA-4/5 with 9/10), if yes, I expect Sui Gas Society would finally get rid of its much maligned Ganda nulla single road approach ! |
Kamal replied on Thursday, May 19, 2011 12:02 PM
I visited pakistan 6 months back and road along ganda nala was widened and two lane road was going towards sui gas -1.. u already got rid of single road single road approach..i am sure this bridge will be major link between DHA phase4/5 with phase 9/10..can you please get a drawing and post it here from PMU of ring road..thanks |
Tariq replied on Saturday, July 23, 2011 11:00 AM
Dear Mujahid Sb I have a plot in Statelife Phase II in Block BB One Kanal. Its cost me about 13Lac in 2007 (All Installments PAID). Plz tell what is the worth of this. and if i keep this for 2 to 3 years more. what would be the worth of this in next 2 to 3 years. Moreover plz guide me should i keep this or NOT. Thx Tariq |
Hanif Qureshi replied on Monday, October 3, 2011 10:16 AM
What happened to the road being built on ganda nala connecting ferozpur road and township? I have alos heard that they are planning a Daweoo Bus Terminal at the land of former sabzi mandi which has been transferred in July. Does anyone knows whats the LDA planning in this area? |
Anjum replied on Monday, November 21, 2011 08:12 AM
Dear All, Do you have any Information About Construction of Mahmood Ghaznavi Road which will Link Ring Road,New Airport and Commercial Broadway Phase VIII To R A Bazar, Nadeem Chowk, Thanks Anjum |
Shaukat Ali Ansari replied on Wednesday, October 14, 2015 10:26 AM
What is the new updated price of Maraka decided by Punjab government. |
Muhammad usman replied on Friday, January 29, 2016 06:23 AM
sir will lahore ring road go through sui gas phase 2 or bahria town? |
Abubakar replied on Wednesday, December 26, 2018 08:09 AM
When will ring road start from adda plot to babu sabu interchange???? |
Abubakar replied on Wednesday, December 26, 2018 08:10 AM
When will ring road be start from adda plot to babu sabu interchange???? |