I am planning to construct a 10M house in Baharia Town Rawalpindi and need a guidance from the Civil Engineers and Contractors regarding requirement of the material:
Specification of the house are:
1. Ground Floor: Two Beds, One Drawing and dinning room, one TV Lounge,two Bath rooms and one kitchen.
Covered area 1850 sq.ft
2. First floor: Three Bed Rooms, three bath rooms, one TV Lounge,one kitchen and one store. covered area 1250 sq. ft
3. Servant quarter containning bed, kitchen, store, kitchen- covered area 250 sq.ft
Material requirement:
1.No. of Bags of cement
2.No. of tons of Steel
3.No. of bricks
4.Crush, No. of dampers
5.Sand, No. of dampers
6. No. of bags of cement required upto DPC Level (foundation depth is 4feet)
6.No. of tones of steel up to DPC level
Note: Which is good option either purchase steel, bricks and cement in lump sum or part by part
Answer of above said queries will be well regarded and appreciated.
please, left your contact Nos. so that I can make contract agreement if rates are accepable to me.
Thak u all atiq raja. replied on Tuesday, January 10, 2012 02:00 PM
you can not estimate like this,simply 1300 to 1800 per/sqft according to the covered area. |
Habib Ullah replied on Wednesday, January 11, 2012 05:27 AM
cement bags: 820 Nos. Steel:10 ton Bricks: 80,000 Nos. Crush: 2608 cu-feet Sand: 2600 cu-feet |
Pardesi log replied on Wednesday, January 11, 2012 06:26 AM
Thank u Habib ullah Sahib: But, regarding No. of bags of cement, it is informed to me that around 1300 to 1500 bags of cement are required fo 10M, double storey house. Can u please re-confirm this figure, please. |
.... replied on Wednesday, January 11, 2012 06:37 AM
My experience tells me that 900-1000 bags of cement are enough for 10 marla double story house if you go for RC lanter |
Habib Ullah replied on Wednesday, January 11, 2012 07:22 AM
Keep in mind 1000. |
Bilal2012 replied on Wednesday, January 11, 2012 07:39 AM
@Habib 10 ton steel? i dont think 10 ton steel is required |
Civil Contractor replied on Wednesday, January 11, 2012 08:29 AM
1500bags are required. |
Pardesi log replied on Wednesday, January 11, 2012 08:32 AM
There is a big gap b/w 1000bags and 1500bags, kindly give me the accurate estimate based on the above said specifications of the house. |
kashif Ali replied on Wednesday, January 11, 2012 11:08 AM
Brother I constructed my 10 marla house and roughly 1000 BAGS used for complete 10 marla double story. |
Irfan Raja replied on Wednesday, January 11, 2012 02:43 PM
I used 995 bags exactly. |
Ch. Nadeem Aslam. replied on Wednesday, July 18, 2012 01:59 PM
Dear I want to construct 5 marla double story corner house in DHA lahore. Can you please tell me how much bricks, sand, crush and steel I need to complete grey structure. |